AI
Ar
Soft-Launching
Test Drive
Quotation Request
Get Financing
Book a Test Drive
Request a Financing Offer
Request a Quotation Offer
  Send
 Close
AUDI
SQ8
 Compare

AUDI SQ8 2025 Price in Qatar

Specifications
Shape SUV Cars
Fuel Petrol
Engine 4.0L TFSI
Tank capacity 85 Liters
Horsepower 507 HP
Torque 770 NM
Wheel drive AWD - All Wheel Drive
Gear Automatic
From 0 to 100 km/h 4.1 Seconds
Top Speed 250 KM / Hour
Consumption 7.2 Km/L
Finance / Offer
Year 2025
Price
Starting from
QR 565,000
By: Q Auto LLC
Exterior
The Audi SQ8 offers Signature S exterior design elements, including quad exhaust tips and alu-optic mirror housings. Plus, a bold take on the  Singleframe® grille ensures a distinctive presence on the road. The available Black optic package features 22` 10-spoke Y-design wheels in metallic black. Anthracite gray Audi rings, black exterior trim, and black exhaust tips complete the look. Wheel shown is the optional 23` multi-spoke design in bicolor finish. Choose from standard 22` wheels, or go big with optional 23` multi-spoke design wheels (shown) in bicolor finish with 285/35 R23 summer tires. Available Audi laser light technology produces a low and wide beam for  enhanced visibility, perfectly complementing the available HD Matrix-design headlights.

AUDI SQ8 2025 Price in Qatar

Interior
S Also Impresses On The Inside
Every journey is a special experience in the Audi SQ8. The exclusive interior design with S-specific elements exudes sportiness and style.
Designed For Sportiness
The sport seats plus, front in Valcona leather with S embossing and active seat ventilation, perforated surfaces and rhombus pattern are designed for sporty driving. You can also choose from two new high-quality inlays in aluminum and carbon.
Multifunctional Space Concept
There’s plenty of space for all passengers including their luggage. The rear seat bench plus enables a variable division of space.

AUDI SQ8 2025 Price in Qatar

Performance
Biturbo V8.
You can expect thunderous S model performance from the Audi SQ8—thanks to its 4.0-liter biturbo V8 engine, capable of up to 500 HP.
Sport Adaptive Air Suspension.
Continuously adapting to road conditions, the sport adaptive air suspension adjusts automatically to optimize driving dynamics and comfort.
S Sport Package.
Available S Sport package includes red brake calipers as well as sport rear differential and active roll stabilization, which helps improve handling and reduce body lean.
All-wheel Steering.
All-wheel steering enhances low-speed handling by slightly turning the rear wheels in the opposite direction of the front, making parking lot maneuvers easier with an increased low-speed turning radius. It also provides stability at higher speeds as the rear wheels steer in the same direction.

AUDI SQ8 2025 Price in Qatar

Safety
With adaptive cruise assist with lane guidance, the hands-on system maintains a time-distance setting to the vehicle ahead and helps keep you centered in your lane. With optional Night vision assistant, you’re able to see pedestrians or large animals that may be in your path. The intuitive, thermal imaging camera detects objects and projects images onto the Audi virtual cockpit plus. Available on the Audi RS Q8 performance, intersection assist uses sensors to help detect cross traffic when pulling through an intersection and can help intervene via a brief braking to warn the driver of a potential collision.

AUDI SQ8 2025 Price in Qatar

Tech
Virtual Cockpit Plus.
As a customizable digital instrument cluster, Audi virtual cockpit plus presents key information right in your field of view on a stunning, 12.3` HD display.
Mmi Touch Response
MMI touch response offers intuitive technology that’s as easy to use as your smartphone—placing you in command via a driver-centric, interactive display with haptic feedback. A secondary, touchscreen manages climate controls and features handwriting recognition.
Bang & Olufsen®.
Surround yourself with exceptional sound quality. The optional Bang & Olufsen Advanced sound system with 3D sound features 23 speakers, a 23-channel amplifier, and 1,920 watts.
Easy As A Smartphone
Access your phone to connect to your favorite apps, music, maps, messages, and more with wireless Apple CarPlay and Android Auto.

AUDI SQ8 2025 Price in Qatar

Video

AUDI SQ8 2025 Price in Qatar

All information & media files are for reference only and not legally binding
All data and images displayed on this website are provided by the advertiser. While we strive for accuracy, errors may occur in the information, prices, offers, videos or images submitted by the advertiser or during the data entry process. Therefore, (Tailma Tech QFZ LLC), through its platform (Mawater Show ®), assumes no responsibility or liability for any inaccuracies. We strongly recommend that users personally verify the details and conduct a thorough inspection before making any purchase.
Terms and Conditions
Platform Map
©2026 Tailma Tech